Port Alfred 2.0 ML RO Plant Production December 2021 January February 2022
During January the RO Plant’s intake from the river was causing damage to the plant and it was decided to reduce the inflow to produce a minimum of 1.5 ML per day from the contracted 2.0 ML per day.
The average daily production for December was 2.09 ML per day.
The daily production for the first two weeks in January is tabled below and then QFS reduced the output to a minimum of 1.5 ML per day see tables below:
The February production figures showed an increase towards the end of the month – see table below: